BuildBros

Bathrooms

The best room in the house.

You start your morning there and end your day there. We think it deserves more than 90s tile and a bad fluoro. Honest pricing, custom joinery, and watertight detailing on every single build.

Dramatic dark marble bathroom with white vanity and frameless shower

Before & after

The bit that makes it worth it.

Three recent jobs, taken from a tired existing bathroom through to the finished room. Stripped to studs, rebuilt properly.

Moorooka bathroom — before
Before
Moorooka bathroom — after
After

Moorooka

Moorooka

Stripped to the studs. New plumbing, new electrical, new everything. A bathroom that finally fits the rest of the home.

Belinda Circuit bathroom — before
Before
Belinda Circuit bathroom — after
After

Brisbane

Belinda Circuit

Dated white tile and a tired shower box replaced with book-matched marble, a floating vanity, and a frameless walk-in shower.

Darra bathroom — before
Before
Darra bathroom — after
After

Darra

Darra

70s pink floral tile gone. In its place: deep, dramatic marble, twin vessel basins, and a brand-new wet-room layout.


What's included

No tier sheets. No surprise extras.

Every BuildBros bathroom quote includes the full scope below — we don't strip basics out to look cheaper.

Full demolition and removal
Re-plumbing and re-wiring to current code
Membrane waterproofing with photos for your file
Custom vanity, mirror cabinet, niches
Large-format tile or microcement
Frameless shower screens
Tapware, accessories, and PC items installed
Building certifier and trade scheduling

A few more

Finished bathrooms from the last 12 months.

Bright white bathroom with twin vessel basins at Strathburn Street
Compact white bathroom with floating vanity at Strathburn Street
Dramatic dark marble main bathroom at Fulica Street
Dark marble ensuite with oval mirror at Fulica Street
Grey marble bathroom with sunset view at Tingatel Street
Mt Gravatt bathroom with freestanding tub and fish-scale tile
White bathroom with timber vanity and brass tapware at Mt Gravatt
Spa-style white bathroom in Moorooka

The process

Two weeks. Start to finish.

Tight scheduling means your house doesn't sit half-finished for a month while subbies ghost you.

  1. 01

    Free site visit

    We come over, measure up, talk through what you actually use the room for, and listen for what's not working.

  2. 02

    Design & fixed quote

    Layout sketches, materials moodboard, and a fully itemised fixed-price quote within 7 days.

  3. 03

    Two-week build

    Most bathrooms are demo Monday and tiled by the next. We sequence trades tightly so your house isn't a worksite for a month.

  4. 04

    Handover & warranty

    Walk-through, snag list, and a folder with all your tapware specs, paint colours, and warranties.


Tired of looking at that tile?

Send us a few photos and we'll come over for a free site visit. We'll be in and out in 30 minutes.